From Temporary Power to a Permanent Solution in Merseyside

FW Power supplied a 220 kVA Blackwell diesel generator powered by Cummins and coordinated a standby power changeover at a Merseyside newspaper printing site.

220 kVA Blackwell diesel generator on a delivery truck for the Merseyside standby power project
The Cummins-powered Blackwell generator ready for delivery to its permanent standby role.
Generator
220 kVA Blackwell
Engine
Cummins powered
Application
Permanent standby power
Location
Merseyside

At a busy newspaper printing facility, reliable power is essential. Production schedules are tight, deadlines do not move, and an interruption can quickly become a major operational problem. Having a dependable standby generator ready when needed is an important part of the site's power provision.

FW Power Generators was called upon to supply a permanent standby power solution for a leading newspaper printing company in Merseyside. The project brought together generator supply, transport and site coordination, with a short-notice changeover from an existing temporary hire generator.

The challenge: replacing temporary power at a newspaper printing facility

The site was already being supported by a hire generator while a permanent solution was arranged. Replacing that machine required coordination between the customer, FW Power and the companies supporting the changeover.

There was little room for delay. The new generator needed to reach the site, be positioned and take the place of the temporary machine quickly and efficiently. For a printing operation working to demanding deadlines, the logistics of that transition mattered just as much as the equipment itself.

A 220 kVA Blackwell diesel generator powered by Cummins

We supplied a 220 kVA Blackwell diesel generator powered by Cummins, giving the customer a robust, long-term standby power solution. The permanent machine was supplied to support the facility when needed, replacing its temporary hire arrangement.

This project is another example of a Blackwell diesel generator taking on a standby role in a demanding commercial environment. Visitors can explore the manufacturer's generator range on the Blackwell Generators website.

Coordinating a short-notice generator changeover

Despite the short notice, the new Blackwell set was transported to the Merseyside site and positioned, and the transition from the hire generator to the customer's permanent machine was successfully coordinated.

That required clear communication about the delivery, the temporary equipment and the practical needs of the site. Keeping everyone involved informed helped bring the separate parts of the project together.

Green Blackwell standby generator being lifted by crane at the Merseyside printing facility
The Blackwell set being lifted into position as part of the generator changeover.

Genertech support with the generator swap and temporary cables

A big thank you to Genertech for their support on this project. Even with very short notice, their team worked with us to swap the hire generator for the new machine and supply the necessary temporary cables, helping make the changeover as smooth as possible.

Responsive support from the companies involved made a real difference to the coordination of the job. Projects like this rely on people being prepared to communicate, organise and respond when required.

The result: permanent standby power in Merseyside

The printing facility now has its own 220 kVA Blackwell generator, powered by Cummins, delivered and ready to provide dependable standby power. The temporary hire arrangement has been replaced by a permanent solution for the customer's longer-term requirements.

For FW Power, supplying a generator is only one part of the job. Transport, positioning, communication and site coordination all contribute to bringing a standby power project together successfully.

Newsprinters Knowsley display at the newspaper printing facility in Merseyside
Inside the newspaper printing facility in Merseyside.
FW Power team member in a high-visibility vest at the newspaper printing facility
FW Power on site during the standby power project.

Discuss a similar standby power project

If you are moving from temporary generator hire to a permanent standby solution, speak to FW Power about your requirements. Explore our new diesel generators and Blackwell generator range, or find out more about our generator installation and commissioning services.

Let’s put your power in place.

Tell us what you need to power. We’ll help you find the right solution.

Talk to our team