Home / Case study · 27th January 2025
Case study · 27th January 2025

Delivering Power Before Christmas

Discover how we successfully delivered a generator to a shopping centre at the last minute, ensuring minimal disruption and keeping operations running smoothly. Read our case study to learn about the challenges faced and solutions implemented.

 Delivering a Critical 200 kVA Generator for a Christmas Grand Opening

When a shopping centre reached out to us with a tight deadline for their grand opening just before Christmas, we knew the stakes were high. With only days to go, their event was at risk of being delayed, and they needed a reliable power solution to ensure the event’s success and the safety of all attendees. Here’s how we rose to the challenge and delivered a 200 kVA Doosan New diesel generator when others couldn’t — or simply wouldn’t.

The Call That Started It All

It was just a few days before Christmas when we received an urgent call from a shopping centre. They were gearing up for a highly anticipated grand opening, but their life safety equipment was at risk of not having the necessary power to operate. With the event just around the corner, they had a critical deadline they couldn’t afford to miss.

Their original plans had fallen through, and they urgently needed a reliable power source to ensure the safety of the building and everyone inside. In a typical situation, power might have been a secondary consideration — but with life safety equipment, this was a matter of life or death.

The Challenge: Tight Timeframes and Multiple Hurdles

The request was simple in theory: deliver and commission a 200 kVA Doosan New diesel generator to power the centre’s life safety systems before the grand opening. However, this was far from a straightforward task. The timeline was exceptionally tight, and numerous challenges stood in our way.

First, we had to secure the right equipment in a market where demand was high. With the Christmas season approaching, supply chains were strained, and many providers were unwilling to take on last-minute jobs. Others simply didn’t have the available stock, while some weren’t interested in delivering under such a tight deadline.

But this is where we thrive. Our team specialises in fast, efficient solutions — even when others back out or make excuses. We knew that we could deliver on time and provide the shopping centre with the power they desperately needed.

The Solution: Delivering When Others Couldn’t

Once we confirmed the details with the shopping centre, we sprang into action. We quickly secured a 200 kVA Doosan New diesel generator, a robust and reliable model capable of handling the power requirements for the life safety equipment.

The next step was logistics. Despite the pressure, we worked with precision to arrange for the generator’s timely delivery. Our experienced team ensured that we met every challenge head-on, from securing permits to navigating tight spaces for installation.

As we delivered the generator and set it up at the site, we were also responsible for commissioning it to ensure it powered the life safety equipment correctly. This was a crucial step, as it meant the shopping centre would be fully prepared for the grand opening with the right power support in place.

The Outcome: A Smooth Grand Opening

Despite the tight timeframes and the many obstacles we faced, we successfully delivered the generator and had it commissioned well before the grand opening. The shopping centre was now fully prepared to welcome visitors, with their life safety systems operating smoothly and without any hitches.

When the big day arrived, the grand opening went off without a hitch — and we were proud to know we had played a key role in making it happen. The shopping centre’s team was thrilled with our professionalism and commitment, especially when other suppliers had backed out.

Why Choose Us for Last-Minute Solutions?

In situations like these, it’s not just about having the right equipment — it’s about having the right team in place to make sure everything runs smoothly, even under the most challenging circumstances. When others were unwilling or unable to deliver, we stepped up to ensure our client’s grand opening was a success.

If you need a fast, reliable power solution, trust us to deliver. We specialise in tight deadlines, and our team is always ready to provide a solution — no matter how complex or urgent the situation may be.

Conclusion

When time is of the essence, and the stakes are high, we’re the team that gets things done. From the initial call to the day before the grand opening, we managed to deliver, install, and commission a 200 kVA generator for the shopping centre’s life safety equipment with time to spare. This case highlights our dedication to meeting our clients’ needs and ensuring their operations continue without interruption, even in the most time-sensitive situations.

If you find yourself in a similar situation — with a tight deadline and a pressing need for power — don’t hesitate to contact us. We’ll make sure your event goes off without a hitch, just like this one.

If you need assitance with a project similar to the one above please check out our new or used diesel generators.

If you need any help with sizing or installation queries please contact our friendly office who will be able to help. We not only provide generators but fuel tanks, cable, ATS's and all the small bits inbetween!

For more case studies see here.

Contact Us Now

Discuss a similar project

Speak with FW Power about new diesel generators, used generators or installation and commissioning. We can also provide ongoing generator service support.

Let’s put your power in place.

Tell us what you need to power. We’ll help you find the right solution.

Talk to our team